Work included but was not limited to installing structural steel, push walls, MSS optical sorters, bunkers, conveyor belts, hoppers and chutes, stairs, walkways and handrail, safety and access platforms, maintenance platforms, welding of structural steel and walls, air knife and blower, film removal system and ducting, grouting of columns and equipment.
Equipment at this facility: Apron conveyors, metering bin, slider belt conveyors, OCC and paper screens, sorting robots, transitions and hoppers, overhead magnets, manual sort areas with throw chutes, push walls and bunker walls.